FSA:- April 01, 2013
,
(66 Kb)
Total FSA to be recovered (as on April 01, 2013) is as per table given below:-
Sr. No |
Category of consumers |
Total FSA Paisa per Unit |
1 |
Domestic (LT) |
|
Upto 40 units per month |
43 |
41 - 250 units per month |
72 |
251 to 400 units per month |
|
a) (251 to 300) |
81 |
b) (301 to 400) |
90 |
401 and above units per month |
93 |
2 |
Non - domestic |
|
Up to 5kW (LT) |
85 |
Above 5 kW and Up to 20 kW (LT) |
86 |
Above 20 kW and Up to 50 kW (LT) |
93 |
Existing consumers above 50 kW upto 70 kW (LT) |
95 |
Consumers above 50 kW (HT) |
87 |
3 |
HT industry (above 50 kW) |
|
|
Supply at 11 kV |
90 |
Supply at 33 kV |
90 |
Supply at 66 kV or 132 kV |
90 |
Supply at 220 kV |
90 |
Supply at 400 kV |
90 |
Arc furnaces / steel rolling mills if supply is at 11 kV |
90 |
4 |
LT industry (upto 50 kW) |
|
Up to 20 kW |
87 |
Above 20 kW upto 50 kW |
95 |
Existing consumers above 50 kW upto 70 kW (LT) |
98 |
5 |
Agriculture |
|
Metered : |
|
i) with motor upto 15 BHP |
Nil |
ii) with motor above 15 BHP |
Nil |
Un- metered (Rs. / Per BHP / Month): |
Nil |
i) with motor upto upto 15 BHP |
Nil |
ii) With motor above 15 BHP |
Nil |
6 |
Public Water Works |
86 |
7 |
Lift irrigation |
88 |
8 |
MITC |
86 |
9 |
Railway Traction |
|
Supply at 11 kV |
88 |
Supply at 33 kV |
88 |
Supply at 66 or 132 kV |
88 |
Supply at 220 kV |
88 |
10 |
DMRC |
|
Supply at 66 kV |
80 |
Supply at 132 kV |
80 |
11 |
Bulk Supply |
|
Supply at LT |
91 |
Supply at 11 kV |
91 |
Supply at 33 kV |
91 |
Supply at 66 or 132 kV |
91 |
Supply at 220 kV |
91 |
12 |
Bulk supply Domestic (70 kW and above at 11 kV or above voltage) |
81 |
13 |
Street Lighting |
80 |
14 |
Independent Hoarding / Decorative Lighting |
73 |
15 |
Temporary Metered Supply |
1.5 times the energy charges of relevant category for which temporary supply has been sought. MMC and fixed charges, wherever applicable, shall be leviable at the same rates as in case of regular connection |
FSA is subject to change as approved by the Commission from time to time.