एफ एस ए

Last Update: 21-Jan-2015
एफ एस ए:- April 01, 2013 , दस्तावेज देखें (66 Kb)

Total FSA to be recovered (as on April 01, 2013) is as per table given below:-

Sr. No Category of consumers Total FSA Paisa per Unit
1 Domestic (LT)  
Upto 40 units per month 43
41 - 250 units per month 72
251 to 400 units per month  
a) (251 to 300) 81
b) (301 to 400) 90
 401 and above units per month 93
2 Non - domestic  
Up to 5kW (LT) 85
Above 5 kW and Up to 20 kW (LT) 86
Above 20 kW and Up to 50 kW (LT) 93
Existing consumers above 50 kW upto 70 kW (LT) 95
Consumers above 50 kW (HT) 87
3 HT industry (above 50 kW)  
  Supply at 11 kV 90
Supply at 33 kV 90
Supply at 66 kV or 132 kV 90
Supply at 220 kV 90
Supply at 400 kV 90
Arc furnaces / steel rolling mills if supply is at 11 kV 90
4 LT industry (upto 50 kW)  
Up to 20 kW 87
Above 20 kW upto 50 kW 95
Existing consumers above 50 kW upto 70 kW (LT) 98
5 Agriculture  
Metered :  
i)    with motor upto 15 BHP Nil
ii)   with motor above 15 BHP Nil
Un- metered (Rs. / Per BHP / Month): Nil
i)    with motor upto upto 15 BHP Nil
ii)   With motor above 15 BHP Nil
6 Public Water Works 86
7 Lift irrigation 88
8 MITC 86
9 Railway Traction  
Supply at 11 kV 88
Supply at 33 kV 88
Supply at 66 or 132 kV 88
Supply at 220 kV 88
10 DMRC  
Supply at 66 kV 80
Supply at 132 kV 80
11 Bulk Supply  
Supply at LT 91
Supply at 11 kV 91
Supply at 33 kV 91
Supply at 66 or 132 kV 91
Supply at 220 kV 91
12 Bulk supply Domestic (70 kW and above at 11 kV or above voltage) 81
13 Street Lighting 80
14 Independent Hoarding / Decorative Lighting 73
15 Temporary Metered Supply 1.5 times the energy charges of relevant category for which temporary supply has been sought. MMC and fixed charges, wherever applicable, shall be leviable at the same rates as in case of regular connection

FSA is subject to change as approved by the Commission from time to time.

Back